Product Description

 CHANNEL STEEL
 IntroductionProductchannel steel
StandardASTM,BS,GB,JIS,etc
GradeSS400, ST37-2, A36, S235JRG1, Q235, Q345 etc
 SpecificationsProduct Keywordsc channel for building
manufacturing techniqueHot rolled(elementary) Can be processed again repeatedly
strength of extensionA36/420MPa S355JR/485MPa
ShippingTechniqueHot Rolled or cold rolled
Delivery Time10~20days
Shipping1)Shipping by containers2)Shipping by bulk ship
Surface treatmentgalvanized or as customer's request


SPECIFICATIONSIZEKG/M
5#50*37*4.55.438
6.3#63*40*4.86.634
8#80*43*5.08.045
10#100*48*5.310.007
12#120*53*5.512.059
14#A140*58*6.014.535
14#B140*60*8.016.733
16#A160*63*6.517.24
16#B160*65*8.519.752
18#A180*68*7.020.174
18#B180*70*9.023
20#A200*73*7.022.337
20#B200*75*9.025.777
22#A220*77*7.024.999
22#B220*79*9.028.453
25#A250*78*7.027.41
25#B250*80*9.031.335
25#C250*82*11.035.26
28#A280*82*7.531.427
28#B280*84*9.535.823
28#C280*86*11.540.219
30#A300*85*7.534.463
30#B300*87*9.539.173
30#C300*89*11.543.883
32#A320*88*8.038.083
32#B320*90*10.043.107
32#C320*92*12.048.131
36#A360*96*9.047.814
36#B360*98*11.053.466
36#C360*100*13.059.118
40#A400*100*10.558.928
40#B400*102*12.565.204
40#C400*104*14.571.488

Fixed packing, loading, transportation, unloading the matters needing attention:

(1) The lifting large there must be a person responsible for the use of fixture, suitable, strictly abide by the

rules of lifting, to prevent the occurrence of vibration, impact, deformation or damage, fall in the hoisting process.

(2) At the time of loading, there must be a special supervision, check car number and packing, the car pile

up securely, and to increase the necessary binding component loosening, prevent the loss.

(3) Remained stable in the transport process, the vehicle at the time of shipment, on the long, wide, high object transport, must be trained pilots, escort personnel responsible for, and mark is arranged on a vehicle.

(4) No rough handling, loading and unloading personnel handling, weight, size should be familiar with the components, and check the horse sling, rigging, prevent accidents.

(5) The member to the construction site, timely organization of unloading, stacking area.

(6) The crawler crane carrying member, should pay attention to the surrounding terrain, air condition, prevent the crawler crane overturning and component collision.

Product Show

图纸.png

微信图片_20220929160218.png

Application
图片1.jpg
Certificate
图片1.jpg
FAQ

Q: Are You Manufacture or Trade Company?

A: We are the professional manufacturer of steel products located in Shandong province, China. Welcome to contact us and visit our factory before you place orders.

Q: How do you guarantee the quality?

A: We can send free samples to you, we can accept third-party testing.
We also have test certificate, every batch goods will be testing before shipment, and the testing report will delivery to you with your goods.

Q: Can I get free samples?

A: Of course you can. We can produce according to your samples or technical drawings. Contact us by whatsapp or email to get free samples and you will get the sample after 3-7 working days.

Message
Submit
Products Recommended